Data centres need a secure and reliable electricity supply to keep digital services running.

We are in discussions with network operators with the aim of securing a grid connection as soon as possible. This would see the data centre campus being powered by the grid. However, there may not be sufficient capacity within the relevant timeframes. An independent power source may therefore be required.

The c.200MW energy centre (under Power Supply Scenario 1) would be powered by gas utilising an existing pipeline running along the western edge of the site. We are working with Cadent, the gas provider, to ensure that usage does not affect neighbouring homes or businesses. Alternatives such as large-scale renewables are not practical or currently deliverable within the wider site area.

If we bring forward the Power Supply Scenario 1, we anticipate the energy centre would be required for up to approximately 15 years, and would provide a power source for up to two of the three data centres. The first data centre is anticipated to become operational in or around 2031. The full operation of the third and final data centre would occur once there is available grid capacity for the project to connect to (expected to be in 2040).

Under Power Supply Scenario 2, presented in our latest plans, the data centre campus would be supplied directly from the existing 400kV overhead transmission lines in the north east of the site. This would require a new on-site 400kV substation and up to two new pylons to connect into and redirect the existing overhead lines. Scenario 2 would require a grid connection from the start of operation and would therefore not require the energy centre to be built.

Further information on SDC’s power strategy for the project is included in the Community Consultation Environmental Report (CCER, p9-13)

SDC is a specialised developer of cloud technology, and the location of the project also lends itself to cloud computing. The Slough Availability Zone is one of the most important data centre clusters in Europe, providing highspeed digital connections via fibre optic cables to ensure people and businesses can access their data quickly.

The project is therefore being developed with cloud computing in mind, however we can’t rule out a level of AI use in future, which will depend on the needs of the operator.

It is not considered that the project will introduce any new security threats to the surrounding area and local community. We are continuing to develop a robust security strategy to ensure the site is safe and secure. This includes having a secure perimeter and restricted access to prevent anyone who is unauthorised from entering the site.

Data centre buildings would be up to approximately 40 meters in height from ground level. This is 134m above Ordnance Datum (AOD)*. On top of buildings, there will be rooftop plant (machinery), including stacks (chimneys) from the back-up generators of the data centres. The main development area is located in the lowest part of the site, and we are proposing to excavate soil so that buildings are located below existing ground level.

As part of current plans for the energy centre (Power Supply Scenario 1), backup generator stacks (or flues) are currently estimated to be 66 metres from ground level (160m AOD). At this stage in the design process, the stack heights are undergoing further testing to determine the appropriate height with regard to key areas including noise, atmospheric emissions and potential impacts on landscape and build heritage.

*AOD measures height above sea level. The site base level for the main development area is 94m AOD.

A full summary of potential views is available in the Community Consultation Environmental Report (CCER, p30-31), and a number of wireline photomontages from the surrounding area is also available in the Visualisations Pack (p17-79).

We do not expect the buildings to be visible from most parts of Beaconsfield and Hedgerley Green due to screening by intervening vegetation.

There would also not be views from most parts of Hedgerley but some buildings would potentially be seen from the northern section of Village Lane and from some houses on the northern edge of the village.

The project will not be visible from most parts of Gerrards Cross, although some glimpsed views of buildings and structures will potentially be available from a small part of Gerrards Cross Common, from residential properties along the western edge of the town and from Footpath GEC/14/2* that extends west across Bulstrode Park. With reference to page 31 of the CCER, following further review, the project will not be visible from most parts of the Gerrards Cross Conservation Area, although there is the potential from some views along its western edge as illustrated on pages 58-61 of the Visualisations Pack.

The project will not be visible from land on the northern side of Jordans although there is the potential for some glimpsed views of buildings and structures from the southern side of the village.

The project will be visible from Footpath GEC/11/1 and Footpath GEC/13/1, which head south across the site from the A40 Oxford Road. The partial enclosure of near distance views of the energy centre (Power Supply Scenario 1) by proposed vegetated embankments would be experienced from Footpath GEC/13/1, not Footpath GEC/11/1 as stated on page 31 of the CCER and in the titles on pages 27-34 of the Visualisations Pack.

*The locations of all footpaths listed are available to view on Buckinghamshire Council’s website

Cooling of the data centre campus is likely to be predominantly through air cooling technology, with the potential for an element of water cooling but within the confines of the available water supply.

Where water cooling technology is to be used, this will be non-potable water (i.e. non-drinking) water, and will not be sourced from local drinking water supplies. We are evaluating several potential sources of non-potable water, including rainwater harvesting.

This means that in the event of a drought, for instance, water would not be diverted from the local community to the site.

We will comply with British Standards for noise and vibration wherever possible and are carrying out noise modelling, including during the nighttime, to understand potential noise levels at the closest properties. This will help to identify any noise reduction measures required.

Once operational, noise from the campus would mainly come from cooling, ventilation and power equipment. The design will include noise reduction technology such as attenuators and silencers on cooling units, fans and back-up generators. High-performance silencers would also be used on energy centre noise sources such as stacks and air vents, with turbines, engines and other mechanical equipment enclosed where needed.

The proposals are being developed by technical experts and will be rigorously assessed by the Planning Inspectorate, the Environment Agency, HSE and other relevant statutory bodies.

For example, air quality modelling is ongoing to ensure that airborne emissions do not breach air quality regulations in relation to human health. The energy centre and data centre are being designed to minimise potential air quality effects at source, such as through emissions reduction technology and stack (flue) heights.

We are carrying out studies on potential electromagnetic field (EMF) radiation and thermal radiation that may be generated by the development in order to inform its design. However, we expect the design will include sufficient measures to ensure that EMF and thermal radiation are within the required levels that ensure there are no negative impacts to the health and wellbeing of nearby residents.

The project will also need to adhere to strict regulations regarding fire safety, the storage of fuels on-site, and health and safety, so that any risks to community safety are strictly managed and mitigated.

Our Community Consultation Environmental Report (CCER), which you can read in full here, includes more information on how residents' health and safety is being considered as part of noise, air, waste assessments.

All works will be undertaken in line with the environmental permit issued by the Environment Agency.

There will be further ground investigations before any excavation works take place, and this will inform the Remediation Strategy for managing excavated material. This will help to ensure there is no unacceptable risk to humans or the natural environment. Material excavated during construction would be managed in accordance with its characteristics and any applicable regulatory requirements. Where excavated material is classified as waste, it would be transported to an appropriately licensed facility for treatment, recovery or disposal.

The closest residential properties to the site are shown in Figure 9 of the Community Consultation Environmental Report (CCER, p25). Study areas have been used to establish the area within which residential properties could experience impacts.

Residential properties are being assessed as relevant within an area of up to 2.5km from the site. Residential properties beyond those identified in the CCER and study areas would experience lesser impacts than those closest to the site.

Where residential properties are not assessed within the Environmental Statement (ES) (to be submitted with the application for development consent), this is because significant effects are not expected.

As part of our application for Development Consent, we are required to identify and to engage with any individuals or organisations (‘parties’) with an interest(s) in the land or a right(s) over the land within the project’s proposed site boundary, also referred to as the ‘draft Order Limits’. These parties include owners, lessees, tenants and occupiers of the land within the draft Order Limits, as well as persons with the benefit of a right(s) over that land. We are also required to identify properties which are neighbouring and in close proximity of the site with the potential to be impacted by the environmental effects arising from the construction and/or operation of the project.

With regard to the project, the parties referred to above are being identified via a number of methods as part of a process known as ‘land referencing’, including land registry and local authority enquiries / searches. Furthermore, on-site investigations are being carried out to verify ownership and occupation details where possible, and Land Interest Questionnaires (LIQs) are being issued to all parties identified through the process.

In the event that the construction and/or operation of the project negatively impacts property value, compensation may be payable – subject to a qualifying claim being made and the reduction in property value being caused directly by the project. Any such claim will be assessed in accordance with the ‘Compulsory Purchase Compensation Code’. Further guidance about Compulsory Purchase and Compensation is available via the RICS (Royal Institution of Chartered Surveyors) website.

As part of the existing landfill permit, there is an approved landscape restoration plan.  A planning application to amend the restoration programme has been submitted to Buckinghamshire Council by Veolia and is currently in the process of being determined.

SDC is proposing to deliver commitments within this amended restoration plan to enhance ecology and improve public access, with some variations to enable the main development area for the data centre campus to come forward.  A minimum of 10% Biodiversity Net Gain and enhanced rights of way would also be delivered on top of this.

Biodiversity Net Gain (BNG) is calculated using Defra’s Statutory Biodiversity Metric. First, the baseline (i.e. the existing conditions) is established, via surveys undertaken by a qualified ecologist, to map the existing habitats in line with the UK Habitat Classification (UKHab). A baseline biodiversity score is established, against which a 10% gain can be measured. The proposed landscaping is then measured via habitats to be retained, impacted, lost, created or enhanced by the project, using the Statutory Biodiversity Metric. This takes into account the time it takes for a new habitat to mature, and the risk of habitat creation failure.

Our latest plans prioritise on-site habitat enhancement and creation within the wider site area, to compensate for the loss of on-site habitats and deliver net ecological enhancements. Proposed landscaping interventions include the creation of new scrubland, species rich grassland, wet woodland and open mosaic habitats to compensate for onsite habitat losses within the main development area (i.e. where the majority of impacts to habitats are expected to occur). This will provide compensatory habitat for species groups which could lose habitat within the main development area, such as invertebrates (open mosaic) and nesting birds (ponds and scrub).

Enhancement of habitat avoids the inherent risks associated with habitat creation such as the risk of failure and the time taken to deliver creation, as quantified within the BNG metric.

The ecological impact assessment (which will form part of the Environmental Statement) evaluates the impact of the project during both the enabling and construction period, and once operational.

This includes an assessment of the impact of the enabling and construction works on all relevant nature conservation designations, habitats, flora and fauna, and will conclude, amongst other things, whether effects are expected to be short, medium or long term. The Community Consultation Environmental Report (CCER) provides further detail on the anticipated ecological impacts of the Project, and the environmental measures proposed to mitigate these.

Biodiversity Net Gain (BNG) relates to habitats rather than impacts to fauna. For permanent habitat creation or enhancement that takes place during or after construction, measurements factor in the ‘time to target condition’ – i.e. the time it takes for a newly planted or restored habitat to mature and reach its intended ecological value.

Following comprehensive analysis and traffic modelling, SDC is proposing that construction vehicles entering the site will use the existing access off the A40 Oxford Road in addition to a proposed new vehicle access next to Beaconsfield Household Recycling Centre on the A40 Oxford Road. A plan showing these routes is available here on our website.

Further to transports assessments, as well as feedback from the community and technical stakeholders, Hedgerley Lane will not be used for vehicle access during construction or operation of the project.

Vehicles will primarily access the M40 via the A355 at Pyebush Roundabout, which provides direct access to the strategic road network and would help reduce the need for vehicles to use local roads.

The construction traffic assessment undertaken by our transport consultant indicates that impacts on the local highway network would be limited, with peak construction traffic forecast to result in a minor increase in overall traffic flows during the construction period. The largest increase would be approximately 4.6% in total vehicles (including cars and HGVs) on the A40 Oxford Road, east of Pyebush Roundabout.

We are continuing to engage with Buckinghamshire Council (as Local Highway Authority) and National Highways on our proposed approach to managing construction traffic, and whether improvements to junctions such as Pyebush Roundabout may be required.

An outline Construction Traffic Management Plan, to be submitted with the development consent order application will set out the measures to be adopted to avoid negative impacts to the environment and the local road network. These measures could include restrictions on vehicle routing and timings (to avoid network peak hours and school dropoff/pick-up times), consolidation of trips to minimise the number of vehicles movements, and a daily limit on the number of heavy good vehicles accessing the site.

Once operational, the data centre campus is anticipated to create around 375 jobs. If an energy centre (Power Supply Scenario 1) is required, it could create an estimated further 25 jobs.

These jobs will include a range of roles, including maintenance work and digital sector roles. A total of approximately 769 direct, indirect, and induced jobs* will be created in the South East region, 570 of which will be within Buckinghamshire.

During construction, the project is currently estimated to provide approximately 277 full-time jobs annually, as well as 50 apprentice starts over a construction period of not less than nine years.

*Indirect job creation includes positions in the supply chain that support those primary operations. Induced employment is additional employment supported throughout the broader local economy when direct and indirect workers spend earned wages on everyday goods and services.

As part of the evolving proposals, consideration is being given to an education and employment framework designed to help local people access opportunities arising from the new data centre campus and participate more broadly in the digital economy.

The detail of these initiatives is being considered currently, and we welcome feedback as part of our Stage Two Community Consultation on what could be included, such as those proposed as part of our latest plans – see the ‘Delivering local benefits’ section of the website.

We are also engaging Buckinghamshire Council, Buckinghamshire Business First and higher education providers in relation to local needs, the skills required for operating and maintaining a modern data centre, as well as the wider digital, engineering and technology skills that are relevant to the wider digital ecosystem.

We have analysed all written feedback from Stage One Consultation, which has been considered as the plans have evolved.

The Stage One Feedback Summary Report has been published and is available to view in the ‘Documents’ section of the website, which summarises the feedback received and how we have considered comments.

Please note that your feedback plays an important role in shaping the plans. 

All comments will be reviewed and considered by the project team as plans develop.

An engagement summary report will be submitted as part of the application, setting out the feedback received and explaining how it has been considered.

We intend to submit the DCO application in spring 2027.

We are consulting on our latest proposals for SDC M40 Campus. These are subject to further design evolution, and all written feedback from this consultation will be carefully considered before the plans are finalised and we submit our application for development consent. This is expected to be in spring 2027.

One of the purposes of consultation with the community is to seek feedback while plans are at a formative stage. For this Stage Two Community Consultation, we would particularly appreciate detailed feedback on elements of the project that are more open to change, such as community benefits and our approach to landscaping and public access.

There are some important aspects of the project that are yet to be determined, such as technology solutions for the power supply. Some key elements of the project’s design are driven by the technology that will be chosen, for example stack heights of the energy centre (Power Supply Scenario 1). These are being informed both by ongoing testing and refinement of designs, and dialogue with important technical stakeholder and statutory bodies like the Environment Agency.

All final plans will be available to view when we submit our application for development consent, and there will be a further opportunities to comment on the proposals through the formal planning process, including by submitting representations.